Back to the comparison

Working proposal · estimates you can challenge

The plan behind
the proposal.

Trace both plans through their operating costs, regional budgets and cash requirements.

This plan is not funded or agreed. It assumes new loan terms that lenders have not committed to. The starting cash figures for 2026 still need checking. A yearly surplus does not mean there will be enough cash every month.

Essential support · Central estimate · Built from the services needed · Change assumptions shown

  1. 2027Baseline & reform
  2. 2028Transition
  3. 2029Structural choice
  4. 2030Delivery
  5. 2031Resilience

Yearly estimates unless stated otherwise. £m means millions of pounds. Support includes cash and shared services.

What do the main figures mean?

WRU support needed per region: Yearly cash and shared services needed by each region. This is not all paid as a cash grant.

Yearly support WRU could afford per region: The model’s yearly limit after normal bills and debt payments. It does not cover one-off costs or cash shortages during the year, and depends on the assumptions being met.

Extra yearly funding needed: The gap between the support needed and what WRU could afford, across all regions in that plan. Zero here does not mean there are no cash shortages.

WRU cash gained or used this year: Money coming in minus money going out, including one-off costs and debt payments. Positive means cash gained; negative means cash used. This is a change, not the bank balance.

Extra cash needed in the first 3 years: The largest cash shortfall in the first 36 months, including the safety buffer kept for bills. It is not the sum of three yearly gaps, and no lender has committed this money.

The numbers, year by year

Cash, debt and financial statements

WRU is our reconstruction of the published three-licence structure, not the WRU’s own unpublished budget. Both structures retain four professional teams through FY2028; three in the contraction case from FY2029. Common reforms are available to both.

WRU’s plan — our cost estimates

Extra cash needed in the first 3 years, including a safety buffer: £16.59m. This is money the model says is needed, not money a lender has agreed to provide.

Yearly support: what is needed and what could be afforded · GBP m
MeasureFY2027FY2028FY2029FY2030FY2031
WRU support needed per region£6.70m£6.92m£7.15m£7.38m£7.61m
Yearly support WRU could afford per region£5.60m£8.10m£9.90m£11.60m£11.98m
Extra yearly funding needed£4.42m£0.00m£0.00m£0.00m£0.00m
Funding kept for clubs, SRC and player development£6.13m£6.28m£6.44m£6.60m£6.77m
WRU income and spending — our forecast, not the official accounts · GBP m
MeasureFY2027FY2028FY2029FY2030FY2031
Income, including extra commercial earnings after costs£117.84m£121.60m£123.94m£126.85m£129.83m
Cost of running WRU£67.39m£60.89m£62.42m£63.99m£65.59m
Left after running costs and rugby funding, before interest and tax£8.71m£17.91m£21.50m£25.98m£26.47m
Interest paid£3.89m£3.84m£3.80m£3.75m£3.71m
Depreciation£6.60m£6.76m£6.93m£7.11m£7.29m
Earlier receipts counted as this year’s income£1.50m£1.50m£1.50m£1.50m£1.50m
WRU’s share of one-off changes£2.24m£2.16m£0.65m£0.00m£0.00m
Forecast profit or loss before tax£-2.52m£6.64m£11.62m£16.62m£16.97m
WRU cash: what comes in, what goes out and what is missing · GBP m
MeasureFY2027FY2028FY2029FY2030FY2031
Estimated cash at the start of the year£2.81m£-2.82m£-0.89m£4.82m£14.32m
Cash left after regular bills and debt payments£-3.38m£4.09m£6.35m£9.50m£9.82m
Cash gained or used this year£-5.62m£1.93m£5.71m£9.50m£9.82m
Year-end cash or shortfall, before new funding£-2.82m£-0.89m£4.82m£14.32m£24.14m
Lowest cash figure during the year£-9.16m£-12.49m£-9.43m£-2.84m£6.50m
Minimum cash safety buffer£4.00m£4.10m£4.20m£4.31m£4.42m
Repairing and replacing buildings and equipment£4.30m£4.41m£4.52m£4.63m£4.75m
Loans due in full that need cash repayment£0.00m£0.00m£0.00m£0.00m£0.00m
Loans assumed to be renewed — not agreed£0.00m£0.00m£0.00m£35.70m£0.00m
Closing bank debt£35.70m£35.70m£35.70m£35.70m£35.70m
Closing lease obligations£41.00m£39.70m£38.40m£37.10m£35.80m
Closing debentures£44.60m£42.50m£40.40m£38.30m£36.20m
Detailed WRU Group accounts forecast

Consolidated WRU Group including Cardiff, not all four regions or the legal-parent cash pool. A negative signed cash position is an unmet funding requirement, not an authorised overdraft. Book equity and balanced formulas are not proof of solvency.

Group income statement · GBP m
MeasureFY2026FY2027FY2028FY2029FY2030FY2031
Income, including extra commercial earnings after costs117.00121.34125.18127.61130.62133.69
Operating costs and external allocations112.29111.43106.04104.85103.34105.90
Operating contribution4.719.9119.1422.7627.2727.79
Depreciation and amortisation6.606.606.766.937.117.29
Deferred grant release1.501.501.501.501.501.50
Interest expense4.403.893.843.803.753.71
Interest received0.000.000.000.000.000.00
Exceptional costs0.002.242.160.650.000.00
Loan impairment0.000.000.000.000.000.00
Profit before tax-4.79-1.327.8712.8817.9118.30
Tax0.000.001.973.224.484.57
Net result-4.79-1.325.909.6613.4313.72
Group cash-flow statement · GBP m
MeasureFY2026FY2027FY2028FY2029FY2030FY2031
Starting cash or unfunded shortfall3.903.81-1.021.427.6617.70
Operating cash flow3.717.1714.5018.3722.2622.66
Investing cash flow4.15-4.45-4.56-4.68-4.79-4.91
Financing cash flow-7.95-7.54-7.50-7.46-7.42-7.32
Net movement-0.09-4.822.446.2310.0410.43
Ending cash or unfunded shortfall3.81-1.021.427.6617.7028.13
Group balance-sheet / funding ledger — unfinanced · GBP m
MeasureFY2026FY2027FY2028FY2029FY2030FY2031
Tangible assets146.35144.50142.60140.66138.67136.63
Intangible assets10.109.809.499.188.858.52
Investments0.000.000.000.000.000.00
Stocks1.501.501.501.501.501.50
Debtors after one year19.8019.8019.8019.8019.8019.80
Other debtors within one year21.9022.4022.9123.4423.9824.53
CVC derivative receivable0.000.000.000.000.000.00
Signed cash requirement — not a negative cash asset3.81-1.021.427.6617.7028.13
Extra cash still to be found0.001.020.000.000.000.00
Gross bank principal35.7035.7035.7035.7035.7035.70
Accrued bank interest0.000.000.000.000.000.00
Unamortised bank-fee deduction0.000.000.000.000.000.00
Finance leases42.3041.0039.7038.4037.1035.80
Debentures46.7044.6042.5040.4038.3036.20
Allocated Cardiff external legacy liability1.251.000.740.480.210.00
Other non-financing creditors35.3035.3035.3035.3035.3035.30
Deferred capital grants19.4017.9016.4014.9013.4011.90
Total liabilities180.65175.50170.34165.18160.01154.90
Aggregate group equity22.8121.4827.3937.0550.4864.20
Accounting identity difference-0.00-0.00-0.00-0.000.00-0.00
Why Group and central cash differ

Group cash includes subsidiary resources not established as distributable. This arithmetic bridge does not establish cash-pooling or minority distribution rights. Values are GBP m.

YearEstimated WRU cash or shortfallWRU Group cash or shortfallCumulative difference
2026
2027-2.82-1.021.80
2028-0.891.422.31
20294.827.662.84
203014.3217.703.38
203124.1428.133.99
New money still to be found — illustration only

Not approved, not committed and not added to the unfinanced core. This is a hypothetical non-debt cash/equity entry to meet a year-end floor, not the separate monthly reserve requirement.

YearNew money assumed, not agreedTotal new money assumed so far
20260.000.00
20271.021.02
20280.001.02
20290.001.02
20300.001.02
20310.001.02
Accounting checks and remaining constraints

Do the accounts add up?: pass

  • Executed refinancing draw, fees, maturity, covenant and cash-pooling terms; no reliance on undrawn facility ceilings.
  • Monthly actual FY2026 group/parent/subsidiary cash, restricted receipts, receivables, creditors, tax and grant returns.
  • A current asset register and full-year Cardiff goodwill amortisation; no asset sale proceeds or impairment savings invented.
  • Cardiff external liability counterparty allocation and settlement versus intra-group loans already eliminated.
  • Parent/minority equity attribution and distributions; legal-parent solvency cannot be inferred from aggregate Group book equity.
  • Unfunded signed cash is an informational requirement, not a lawful negative cash asset or authorised overdraft.
  • FY25_OPENING · audited_reported_rounded

    Named reported asset lines and total creditors; £36.8m non-financing creditor residual is derived from audited totals, not forward plug.

  • BANK_CARRYING · audited_opening_estimated_settlement

    £35.7m principal +£0.5m accrued interest −£0.6m fees =£35.6m carrying debt. Default FY26 settlement/write-off is explicit; new fees and accrued movements require ledger.

  • CARDIFF_LEGACY · policy_allocation_not_reported

    £1.5m allocated within existing other creditors; capped repayments. Sensitise 0/1.5/3m; exclude internal loans.

  • FY26_CARDIFF · derived_conditional

    The rebuild cash-deficit assumption is decomposed into operating result, capex, principal, interest and working capital. It is not added as a second expense.

  • ASSET_REGISTER · estimate

    D&A follows main-engine Group proxy, with explicit split and carrying-value caps. Full-year goodwill amortisation, impairment, capex asset lives and renewal adequacy remain open.

  • CASH_CONVERSION · policy_assumption

    Working capital assigned to ordinary receivables and/or creditors; unchanged opening stocks and long-term debtors are explicit flat assumptions, not proof of recoverability.

  • TAX_NCI · estimate_and_disclosure_gap

    Same-period tax proxy uses Group profit, not central profit. NCI ownership attribution, tax entities, losses, VAT, deferred tax and distribution rights unresolved; aggregate equity is not parent-distributable reserves.

  • UNSPECIFIED_ADJUSTMENTS · explicit_zero_scenario_not_evidenced_absence

    Unspecified interest income, new grants, new refinancing fees, minority dividends, external regional loan receipts/conversions/impairments default to zero; sensitivity overrides identify their separate entries.

  • CAPITAL_ILLUSTRATION · unsecured_requirement_not_funding

    Hypothetical cash/equity entries are outside the unfinanced core. They are not approved finance, a financing commitment, or a solvency conclusion.

Monthly cash and reserve, first 36 months
PeriodCash inCash outCash or shortfall before new fundingReserveExtra money needed
2026-07£8.25m£11.72m£-0.67m£4.00m£4.67m
2026-08£4.71m£10.60m£-6.56m£4.00m£10.56m
2026-09£8.25m£10.17m£-8.48m£4.00m£12.48m
2026-10£11.78m£9.96m£-6.66m£4.00m£10.66m
2026-11£17.68m£9.96m£1.06m£4.00m£2.94m
2026-12£4.71m£9.85m£-4.08m£4.00m£8.08m
2027-01£5.89m£10.97m£-9.16m£4.00m£13.16m
2027-02£16.50m£9.85m£-2.51m£4.00m£6.51m
2027-03£12.96m£9.85m£0.60m£4.00m£3.40m
2027-04£5.89m£9.96m£-3.46m£4.00m£7.46m
2027-05£8.25m£10.17m£-5.39m£4.00m£9.39m
2027-06£12.96m£10.39m£-2.82m£4.00m£6.82m
2027-07£8.51m£11.39m£-5.69m£4.10m£9.79m
2027-08£4.86m£10.31m£-11.13m£4.10m£15.23m
2027-09£8.51m£9.87m£-12.49m£4.10m£16.59m
2027-10£12.16m£9.65m£-9.97m£4.10m£14.07m
2027-11£18.24m£9.65m£-1.38m£4.10m£5.48m
2027-12£4.86m£9.54m£-6.05m£4.10m£10.15m
2028-01£6.08m£10.62m£-10.59m£4.10m£14.69m
2028-02£17.02m£9.54m£-3.10m£4.10m£7.20m
2028-03£13.38m£9.54m£0.74m£4.10m£3.36m
2028-04£6.08m£9.65m£-2.82m£4.10m£6.92m
2028-05£8.51m£9.87m£-4.18m£4.10m£8.28m
2028-06£13.38m£10.09m£-0.89m£4.10m£4.99m
2028-07£8.68m£10.65m£-2.86m£4.20m£7.06m
2028-08£4.96m£10.33m£-8.23m£4.20m£12.43m
2028-09£8.68m£9.87m£-9.43m£4.20m£13.63m
2028-10£12.39m£9.65m£-6.68m£4.20m£10.89m
2028-11£18.59m£9.65m£2.26m£4.20m£1.94m
2028-12£4.96m£9.54m£-2.32m£4.20m£6.52m
2029-01£6.20m£9.86m£-5.98m£4.20m£10.18m
2029-02£17.35m£9.54m£1.84m£4.20m£2.37m
2029-03£13.63m£9.54m£5.93m£4.20m£0.00m
2029-04£6.20m£9.65m£2.48m£4.20m£1.72m
2029-05£8.68m£9.87m£1.28m£4.20m£2.92m
2029-06£13.63m£10.10m£4.82m£4.20m£0.00m

YSA four-region proposal

Extra cash needed in the first 3 years, including a safety buffer: £15.81m. This is money the model says is needed, not money a lender has agreed to provide.

Yearly support: what is needed and what could be afforded · GBP m
MeasureFY2027FY2028FY2029FY2030FY2031
WRU support needed per region£6.70m£6.92m£7.15m£7.38m£7.61m
Yearly support WRU could afford per region£5.60m£8.10m£8.37m£8.65m£8.93m
Extra yearly funding needed£4.42m£0.00m£0.00m£0.00m£0.00m
Funding kept for clubs, SRC and player development£6.13m£6.28m£6.44m£6.60m£6.77m
WRU income and spending — our forecast, not the official accounts · GBP m
MeasureFY2027FY2028FY2029FY2030FY2031
Income, including extra commercial earnings after costs£117.84m£121.60m£124.44m£127.35m£130.33m
Cost of running WRU£67.39m£60.89m£62.42m£63.99m£65.59m
Left after running costs and rugby funding, before interest and tax£8.71m£17.91m£18.15m£18.39m£18.63m
Interest paid£3.89m£3.84m£3.80m£3.75m£3.71m
Depreciation£6.60m£6.76m£6.93m£7.11m£7.29m
Earlier receipts counted as this year’s income£1.50m£1.50m£1.50m£1.50m£1.50m
WRU’s share of one-off changes£2.03m£0.87m£0.00m£0.00m£0.00m
Forecast profit or loss before tax£-2.31m£7.93m£8.91m£9.02m£9.14m
WRU cash: what comes in, what goes out and what is missing · GBP m
MeasureFY2027FY2028FY2029FY2030FY2031
Estimated cash at the start of the year£2.81m£-2.60m£0.29m£3.97m£7.78m
Cash left after regular bills and debt payments£-3.38m£3.76m£3.68m£3.81m£3.94m
Cash gained or used this year£-5.41m£2.90m£3.68m£3.81m£3.94m
Year-end cash or shortfall, before new funding£-2.60m£0.29m£3.97m£7.78m£11.72m
Lowest cash figure during the year£-8.94m£-11.71m£-8.63m£-5.15m£-1.55m
Minimum cash safety buffer£4.00m£4.10m£4.20m£4.31m£4.42m
Repairing and replacing buildings and equipment£4.30m£4.41m£4.52m£4.63m£4.75m
Loans due in full that need cash repayment£0.00m£0.00m£0.00m£0.00m£0.00m
Loans assumed to be renewed — not agreed£0.00m£0.00m£0.00m£35.70m£0.00m
Closing bank debt£35.70m£35.70m£35.70m£35.70m£35.70m
Closing lease obligations£41.00m£39.70m£38.40m£37.10m£35.80m
Closing debentures£44.60m£42.50m£40.40m£38.30m£36.20m
Detailed WRU Group accounts forecast

Consolidated WRU Group including Cardiff, not all four regions or the legal-parent cash pool. A negative signed cash position is an unmet funding requirement, not an authorised overdraft. Book equity and balanced formulas are not proof of solvency.

Group income statement · GBP m
MeasureFY2026FY2027FY2028FY2029FY2030FY2031
Income, including extra commercial earnings after costs117.00121.34125.18128.11131.12134.19
Operating costs and external allocations112.29111.43106.04108.71111.44114.24
Operating contribution4.719.9119.1419.4119.6819.96
Depreciation and amortisation6.606.606.766.937.117.29
Deferred grant release1.501.501.501.501.501.50
Interest expense4.403.893.843.803.753.71
Interest received0.000.000.000.000.000.00
Exceptional costs0.002.030.870.000.000.00
Loan impairment0.000.000.000.000.000.00
Profit before tax-4.79-1.119.1610.1710.3210.46
Tax0.000.002.292.542.582.62
Net result-4.79-1.116.877.637.747.85
Group cash-flow statement · GBP m
MeasureFY2026FY2027FY2028FY2029FY2030FY2031
Starting cash or unfunded shortfall3.903.81-0.802.616.8111.15
Operating cash flow3.717.3815.4716.3416.5616.79
Investing cash flow4.15-4.45-4.56-4.68-4.79-4.91
Financing cash flow-7.95-7.54-7.50-7.46-7.42-7.32
Net movement-0.09-4.613.414.204.354.56
Ending cash or unfunded shortfall3.81-0.802.616.8111.1515.71
Group balance-sheet / funding ledger — unfinanced · GBP m
MeasureFY2026FY2027FY2028FY2029FY2030FY2031
Tangible assets146.35144.50142.60140.66138.67136.63
Intangible assets10.109.809.499.188.858.52
Investments0.000.000.000.000.000.00
Stocks1.501.501.501.501.501.50
Debtors after one year19.8019.8019.8019.8019.8019.80
Other debtors within one year21.9022.4022.9123.4423.9824.53
CVC derivative receivable0.000.000.000.000.000.00
Signed cash requirement — not a negative cash asset3.81-0.802.616.8111.1515.71
Extra cash still to be found0.000.800.000.000.000.00
Gross bank principal35.7035.7035.7035.7035.7035.70
Accrued bank interest0.000.000.000.000.000.00
Unamortised bank-fee deduction0.000.000.000.000.000.00
Finance leases42.3041.0039.7038.4037.1035.80
Debentures46.7044.6042.5040.4038.3036.20
Allocated Cardiff external legacy liability1.251.000.740.480.210.00
Other non-financing creditors35.3035.3035.3035.3035.3035.30
Deferred capital grants19.4017.9016.4014.9013.4011.90
Total liabilities180.65175.50170.34165.18160.01154.90
Aggregate group equity22.8121.7028.5736.2043.9451.79
Accounting identity difference-0.00-0.00-0.00-0.000.00-0.00
Why Group and central cash differ

Group cash includes subsidiary resources not established as distributable. This arithmetic bridge does not establish cash-pooling or minority distribution rights. Values are GBP m.

YearEstimated WRU cash or shortfallWRU Group cash or shortfallCumulative difference
2026
2027-2.60-0.801.80
20280.292.612.31
20293.976.812.84
20307.7811.153.38
203111.7215.713.99
New money still to be found — illustration only

Not approved, not committed and not added to the unfinanced core. This is a hypothetical non-debt cash/equity entry to meet a year-end floor, not the separate monthly reserve requirement.

YearNew money assumed, not agreedTotal new money assumed so far
20260.000.00
20270.800.80
20280.000.80
20290.000.80
20300.000.80
20310.000.80
Accounting checks and remaining constraints

Do the accounts add up?: pass

  • Executed refinancing draw, fees, maturity, covenant and cash-pooling terms; no reliance on undrawn facility ceilings.
  • Monthly actual FY2026 group/parent/subsidiary cash, restricted receipts, receivables, creditors, tax and grant returns.
  • A current asset register and full-year Cardiff goodwill amortisation; no asset sale proceeds or impairment savings invented.
  • Cardiff external liability counterparty allocation and settlement versus intra-group loans already eliminated.
  • Parent/minority equity attribution and distributions; legal-parent solvency cannot be inferred from aggregate Group book equity.
  • Unfunded signed cash is an informational requirement, not a lawful negative cash asset or authorised overdraft.
  • FY25_OPENING · audited_reported_rounded

    Named reported asset lines and total creditors; £36.8m non-financing creditor residual is derived from audited totals, not forward plug.

  • BANK_CARRYING · audited_opening_estimated_settlement

    £35.7m principal +£0.5m accrued interest −£0.6m fees =£35.6m carrying debt. Default FY26 settlement/write-off is explicit; new fees and accrued movements require ledger.

  • CARDIFF_LEGACY · policy_allocation_not_reported

    £1.5m allocated within existing other creditors; capped repayments. Sensitise 0/1.5/3m; exclude internal loans.

  • FY26_CARDIFF · derived_conditional

    The rebuild cash-deficit assumption is decomposed into operating result, capex, principal, interest and working capital. It is not added as a second expense.

  • ASSET_REGISTER · estimate

    D&A follows main-engine Group proxy, with explicit split and carrying-value caps. Full-year goodwill amortisation, impairment, capex asset lives and renewal adequacy remain open.

  • CASH_CONVERSION · policy_assumption

    Working capital assigned to ordinary receivables and/or creditors; unchanged opening stocks and long-term debtors are explicit flat assumptions, not proof of recoverability.

  • TAX_NCI · estimate_and_disclosure_gap

    Same-period tax proxy uses Group profit, not central profit. NCI ownership attribution, tax entities, losses, VAT, deferred tax and distribution rights unresolved; aggregate equity is not parent-distributable reserves.

  • UNSPECIFIED_ADJUSTMENTS · explicit_zero_scenario_not_evidenced_absence

    Unspecified interest income, new grants, new refinancing fees, minority dividends, external regional loan receipts/conversions/impairments default to zero; sensitivity overrides identify their separate entries.

  • CAPITAL_ILLUSTRATION · unsecured_requirement_not_funding

    Hypothetical cash/equity entries are outside the unfinanced core. They are not approved finance, a financing commitment, or a solvency conclusion.

Monthly cash and reserve, first 36 months
PeriodCash inCash outCash or shortfall before new fundingReserveExtra money needed
2026-07£8.25m£11.62m£-0.56m£4.00m£4.56m
2026-08£4.71m£10.60m£-6.45m£4.00m£10.45m
2026-09£8.25m£10.17m£-8.37m£4.00m£12.37m
2026-10£11.78m£9.96m£-6.55m£4.00m£10.55m
2026-11£17.68m£9.96m£1.17m£4.00m£2.83m
2026-12£4.71m£9.85m£-3.97m£4.00m£7.97m
2027-01£5.89m£10.86m£-8.94m£4.00m£12.94m
2027-02£16.50m£9.85m£-2.29m£4.00m£6.29m
2027-03£12.96m£9.85m£0.82m£4.00m£3.18m
2027-04£5.89m£9.96m£-3.25m£4.00m£7.25m
2027-05£8.25m£10.17m£-5.17m£4.00m£9.17m
2027-06£12.96m£10.39m£-2.60m£4.00m£6.60m
2027-07£8.51m£10.77m£-4.86m£4.10m£8.96m
2027-08£4.86m£10.33m£-10.33m£4.10m£14.43m
2027-09£8.51m£9.89m£-11.71m£4.10m£15.81m
2027-10£12.16m£9.67m£-9.22m£4.10m£13.32m
2027-11£18.24m£9.67m£-0.65m£4.10m£4.75m
2027-12£4.86m£9.56m£-5.35m£4.10m£9.45m
2028-01£6.08m£10.00m£-9.27m£4.10m£13.37m
2028-02£17.02m£9.56m£-1.81m£4.10m£5.91m
2028-03£13.38m£9.56m£2.01m£4.10m£2.09m
2028-04£6.08m£9.67m£-1.59m£4.10m£5.69m
2028-05£8.51m£9.89m£-2.97m£4.10m£7.07m
2028-06£13.38m£10.11m£0.29m£4.10m£3.81m
2028-07£8.71m£10.59m£-1.59m£4.20m£5.79m
2028-08£4.98m£10.59m£-7.20m£4.20m£11.40m
2028-09£8.71m£10.14m£-8.63m£4.20m£12.83m
2028-10£12.44m£9.91m£-6.10m£4.20m£10.30m
2028-11£18.67m£9.91m£2.66m£4.20m£1.55m
2028-12£4.98m£9.80m£-2.17m£4.20m£6.37m
2029-01£6.22m£9.80m£-5.74m£4.20m£9.95m
2029-02£17.42m£9.80m£1.88m£4.20m£2.32m
2029-03£13.69m£9.80m£5.77m£4.20m£0.00m
2029-04£6.22m£9.91m£2.08m£4.20m£2.13m
2029-05£8.71m£10.14m£0.65m£4.20m£3.56m
2029-06£13.69m£10.36m£3.97m£4.20m£0.23m

A full forward statutory balance sheet is not yet certified. The cash-pool proxy does not establish parent/group solvency; regional opening reserves and contingent liabilities require separate funding evidence.

Staff, services and regional budgets

These are proposed jobs and pay bands for the work needed. They are not a claim that particular staff are overpaid, or a list of jobs to cut. Moving staff to a region does not save cash unless a separate cost actually ends.

Match and rights delivery · proposed cost of the service

Starting point from the 2025 accounts: £10.70m. The proposed service boundary is unverified; this is not a historic line-item reconstruction.

Which staff and employers are included: proposed WRU direct or delivery workforce

  • Broad audited direct-cost perimeter is not disclosed. Mapping to these match/rights services is an explicit unverified design assumption, not a reconstructed historic breakdown.
  • Six home internationals, 12 large event days and 600,000 ticket transactions are linked planning volumes, not verified FY2027 bookings.
  • Opponent guarantees and rights charges require contractual reconciliation: retain obligations until novated; do not claim revenue-growth savings on undisclosed commercial contracts.
Unit rates in GBP; payroll rates are basic salary, employer costs loaded once by the engine
Service / roleNumber / full-time-equivalent jobsLowBaseHighBasis and evidence
Match delivery manager
D-EVENT-MANAGER
1 (1 FTE)60,00075,00090,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Operational event execution; excludes central commercial director and event sales.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Match and accredited-event coordinators
D-EVENT-COORD
4 (4 FTE)33,00040,00047,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Four delivery coordinators covering six senior home matches and third-party event interface.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Box-office and ticket fulfilment staff
D-TICKET-OPS
4 (4 FTE)29,00034,00040,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Operational fulfilment and event support, not central CRM strategy or software.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Accessibility and supporter liaison coordinators
D-ACCESS
2 (2 FTE)34,00040,00048,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Accessibility planning and event casework; preserve reasonable access.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Broadcast and commercial rights delivery coordinators
D-RIGHTS
2 (2 FTE)42,00050,00060,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Deliver sold rights and broadcast host obligations, not central partnership sales.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Visiting union or fixture participation guarantees
D-GUARANTEES
3450,000650,0001,000,000visiting fixture agreements
Formula and source

quantity * unitGBP

Provisional host payments, not Wales player match fees; actual Nations Championship revenue-sharing contracts may replace these gross payments.

policy_assumption

FY2027 required operating service unit design

WRU Nations Championship 2026 fixtures

Rights and competition administration charges
D-RIGHTS-LEVY
660,000100,000160,000senior home match settlements
Formula and source

quantity * unitGBP

Only external organiser, rights delivery or sanction charges; not regional competition pass-through, CVC revenue share or bank fees.

policy_assumption

FY2027 required operating service unit design

Host technical and broadcast provision
D-TV
675,000110,000170,000senior home match days
Formula and source

quantity * unitGBP

Temporary connectivity, OB interface, TV lighting and production hired services; excludes permanent stadium M&E.

policy_assumption

FY2027 required operating service unit design

Match presentation and field-of-play production
D-SHOW
645,00065,000100,000senior home match days
Formula and source

quantity * unitGBP

PA/AV creative execution, temporary presentation crews and opening activity; excludes central creative retainer and stadium security.

policy_assumption

FY2027 required operating service unit design

International match official travel and administration
D-REF
612,00018,00028,000senior home match days
Formula and source

quantity * unitGBP

Match officials' event travel/services; not community referee development or national team player travel.

policy_assumption

FY2027 required operating service unit design

Casual accreditation and box office
D-ACCR
7200172126supplier-paid staff hours
Formula and source

quantity * unitGBP

All-in temporary labour rate; no further employer NI; quantity = 12 major event days * 60 people * 10 hours.

policy_assumption

FY2027 required operating service unit design

Ticket fulfilment transaction service
D-TICKET-SERVICE
6000000.450.71.1chargeable ticket transactions
Formula and source

quantity * unitGBP

Ticket service fulfilment, not payment acquisition fees or central CRM license; volume includes events. Replace if contract fee netted from income.

policy_assumption

FY2027 required operating service unit design

Match and event payment processing
D-PAYMENT
300000000.0080.010.014GBP eligible card receipts
Formula and source

quantity * unitGBP

Merchant acquiring on eligible ticket receipts; exclude hotel/hospitality card turnover and Note16 general bank charges.

policy_assumption

FY2027 required operating service unit design

Club ticket contribution
D-CLUB-TICKET
165000222qualifying paid ticket selections
Formula and source

quantity * unitGBP

Planning 330,000 national home tickets * 50% club selections; £2 programme announcement. Separate from direct community affiliation grants.

policy_assumption

FY2027 required operating service unit design

WRU Nations Championship 2026 fixtures

Contracted sponsor event activation
D-RIGHTS-SERVICE
1225,00040,00065,000partner activation packages
Formula and source

quantity * unitGBP

Delivery-specific temporary set-up and fulfilment; excludes central creative/marketing staff, hospitality food, and in-kind kit cost.

policy_assumption

FY2027 required operating service unit design

Fixture cancellation and event liability cover
D-MATCH-INSURANCE
660,000100,000160,000international fixture cover units
Formula and source

quantity * unitGBP

Event risk only; no duplicate corporate, player or stadium property policy. Quote needed; coverage may exclude cancellation causes.

policy_assumption

FY2027 required operating service unit design

Roof attraction and stadium tour operator service
D-ROOF-TOURS
25000101523visitor service units
Formula and source

quantity * unitGBP

Gross-service costing only if associated gross tour income retained. Do not add to net Zip World commission model.

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, post-balance-sheet operator agreements · p116

Tour and visitor consumables/access maintenance
D-TOUR-KIT
25000123visitor units
Formula and source

quantity * unitGBP

Consumables separate from operator staffing and annual stadium structural inspection.

policy_assumption

FY2027 required operating service unit design

Selected fully loaded FY2027 target — same service design in both structures, GBP m
PayrollSuppliersLevyTotal target
£0.65m£6.41m£0.00m£7.07m
Stadium safe operation and maintenance · proposed cost of the service

Starting point from the 2025 accounts: £8.00m. The proposed service boundary is unverified; this is not a historic line-item reconstruction.

Which staff and employers are included: proposed WRU direct or delivery workforce

  • 29 proposed permanent site FTE versus audited average 34 group stadia employees: neither difference proves five exits nor gives a like-for-like historic FTE bridge.
  • Contracted steward hours are a provisional safe-event footprint, not a substitute for venue safety certification.
  • Maintenance capex, financing, leases, depreciation and hotel/catering specific plant costs excluded; office occupancy on shared stadium meter should not also enter central supplier option.
Unit rates in GBP; payroll rates are basic salary, employer costs loaded once by the engine
Service / roleNumber / full-time-equivalent jobsLowBaseHighBasis and evidence
Stadium operational director
S-DIRECTOR
1 (1 FTE)85,000105,000130,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Site delivery executive; excludes central facilities contract manager.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Engineering and building services leads
S-ME-LEAD
2 (2 FTE)52,00065,00080,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Electrical and mechanical technical leadership.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Multi-skilled maintenance engineers
S-TECH
6 (6 FTE)37,00045,00054,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Planned/reactive small repairs; excludes capital renewal and contractor specialist works.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Groundstaff and pitch manager
S-GROUND
5 (5 FTE)31,00038,00048,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Pitch and training field work within stadium footprint only.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Safety, fire and event operations leads
S-SAFETY
3 (3 FTE)45,00055,00068,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Safety certification and incident planning; excludes central governance.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Permanent site security/control team
S-SECURITY
7 (7 FTE)28,00033,00039,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

24/7 minimum one-post coverage and relief; event supplemental posts costed separately.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Permanent cleaning and logistics
S-CLEAN
5 (5 FTE)26,00030,00035,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Non-event public/common areas; excludes hotel and kitchen cleaning.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Stadium electricity
S-ELEC
35000000.160.210.29kWh
Formula and source

quantity * unitGBP

Includes operational office/common-area supply on stadium meter; hotel kitchen separately submetered consumption must be excluded.

policy_assumption

FY2027 required operating service unit design

Stadium gas/heat supply
S-HEAT
50000000.0450.0650.095kWh
Formula and source

quantity * unitGBP

Space/water heating outside hotel; supplier rate assumed, no energy tariff quote.

policy_assumption

FY2027 required operating service unit design

Water and drainage
S-WATER
650003.557cubic metres equivalent
Formula and source

quantity * unitGBP

Metered water plus wastewater allocation; excludes separately hotel/kitchen supplies.

policy_assumption

FY2027 required operating service unit design

Stadium rates and property insurance packages
S-RATES
1650,000900,0001,250,000site-year
Formula and source

quantity * unitGBP

Annual non-financing occupancy rates/insurance; not a business-rate valuation or debt/lease payment.

policy_assumption

FY2027 required operating service unit design

Roof, life-safety and lift specialist maintenance
S-SPECIAL-ME
1218,00025,00038,000monthly specialist service packages
Formula and source

quantity * unitGBP

Inspections and planned repair labour/materials beyond permanent engineers; no replacement capex.

policy_assumption

FY2027 required operating service unit design

Pitch consumables and event surface conversion
S-PITCH
1218,00028,00042,000conversion/major treatment cycles
Formula and source

quantity * unitGBP

Turf materials, protection-system handling and contracted extra labour; excludes permanent groundstaff.

policy_assumption

FY2027 required operating service unit design

Event steward and search/security shifts
S-STEWARDS
156000162025all-in supplier hours
Formula and source

quantity * unitGBP

12 large events * 1,300 deployed posts * 10 hours; independent safety-certified staffing is prerequisite. No automatic cut based on empty seats.

policy_assumption

FY2027 required operating service unit design

Post-event clean and waste removal
S-CASUAL-CLEAN
2412,00017,00025,000event turnarounds
Formula and source

quantity * unitGBP

12 large plus 12 smaller delivery days; no hotel/hospitality dishwashing.

policy_assumption

FY2027 required operating service unit design

Crowd medical/ambulance cover
S-MEDICAL
1210,00015,00023,000major events
Formula and source

quantity * unitGBP

Spectator provision, separate from professional player clinical teams.

policy_assumption

FY2027 required operating service unit design

Venue operational safety certification
S-LICENCES
165,00090,000130,000annual package
Formula and source

quantity * unitGBP

Structural, fire, electrical and public-safety assurance not generic central audit.

policy_assumption

FY2027 required operating service unit design

Roof/seating/concourse minor repair work orders
S-SMALL-REPAIRS
1001,8002,8004,500repair work orders
Formula and source

quantity * unitGBP

Routine operating repairs; any enhancement or major renewal must instead enter capital schedule.

policy_assumption

FY2027 required operating service unit design

Selected fully loaded FY2027 target — same service design in both structures, GBP m
PayrollSuppliersLevyTotal target
£1.47m£7.00m£0.01m£8.47m
Stadium catering and hospitality gross-service requirement · proposed cost of the service

Starting point from the 2025 accounts: £6.90m. The proposed service boundary is unverified; this is not a historic line-item reconstruction.

Which staff and employers are included: external operator cost equivalent

  • All nine role equivalents are inside an outsourced-service cost, not a proposed WRU payroll transfer.
  • Keep full gross service obligations where matching hospitality/food revenue is consolidated. If actual Aramark contract is concession/revenue share, replace BOTH revenue and cost; never retain £17.7m gross FY2025 revenue with only this fee.
  • The operator fee is an explicit model price, not an estimate claimed from the announced multi-million-pound deal. Contract continuity assumed; no unilateral cancellation.
Unit rates in GBP; payroll rates are basic salary, employer costs loaded once by the engine
Service / roleNumber / full-time-equivalent jobsLowBaseHighBasis and evidence
Catering operator general manager
H-OP-LEAD
1 (1 FTE)65,00080,000100,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Operator-employed cost equivalent, not a new WRU management post.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Kitchen/food safety/hospitality operations managers
H-OP-MGMT
4 (4 FTE)40,00050,00062,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Operator permanent delivery workforce, outside central sales roles.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Hospitality service and purchasing coordinators
H-OP-COORD
4 (4 FTE)30,00036,00044,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Operator's operational ordering/scheduling, not group strategic procurement.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Premium hospitality food and drink inputs
H-PREMIUM-FOOD
50000253445served covers
Formula and source

quantity * unitGBP

No admission ticket or room revenue included in cost; not hospitality selling price.

policy_assumption

FY2027 required operating service unit design

Concourse food/drink cost of sales
H-CONCOURSE-FOOD
6600001.82.43.2purchased items
Formula and source

quantity * unitGBP

12 major event days * 55,000 item purchases; no gross food sales generated automatically.

policy_assumption

FY2027 required operating service unit design

Variable chefs/bar/service/kitchen porter labour
H-SERVICE-LABOUR
62000162025all-in outsourced hours
Formula and source

quantity * unitGBP

Includes holiday/NI/agency margin; no extra loading. Excludes nine permanent operator role equivalents.

policy_assumption

FY2027 required operating service unit design

Linen, tableware rental and consumables
H-SERVICE-STOCK
50000346premium covers
Formula and source

quantity * unitGBP

Dedicated food-service consumption, not stadium post-event refuse contract.

policy_assumption

FY2027 required operating service unit design

Dedicated kitchen utilities
H-KITCHEN-UTIL
1210,00015,00022,000months
Formula and source

quantity * unitGBP

Submetered supply removed from stadium common area utility input.

policy_assumption

FY2027 required operating service unit design

Food equipment service/cleaning
H-KITCHEN-SERVICE
1210,00014,00022,000months
Formula and source

quantity * unitGBP

Kitchen deep cleaning, grease waste and routine appliance repair, not capital equipment.

policy_assumption

FY2027 required operating service unit design

Hospitality payment acquisition
H-MERCHANT
100000000.0080.010.014GBP eligible card receipts
Formula and source

quantity * unitGBP

Not ticket or hotel payment turnover; actual eligible cash/card split needed.

policy_assumption

FY2027 required operating service unit design

Operator management and commercial return
H-OPERATOR-FEE
1350,000550,000850,000annual outsourced operator service fee
Formula and source

quantity * unitGBP

Fee is ADDITIONAL to specified labour and input reimbursements only in cost-plus option. NOT the actual disclosed Aramark fee.

policy_assumption

FY2027 required operating service unit design

Principality Stadium appointment of Aramark

Non-match dining/event incremental staff and materials
H-NONMATCH
1201,4002,2003,500non-match bookings
Formula and source

quantity * unitGBP

Incremental staff/food not counted in 50,000 major-event covers or permanent roles.

policy_assumption

FY2027 required operating service unit design

Selected fully loaded FY2027 target — same service design in both structures, GBP m
PayrollSuppliersLevyTotal target
£0.50m£5.99m£0.00m£6.49m
170-room hotel full gross-service requirement · proposed cost of the service

Starting point from the 2025 accounts: £9.20m. The proposed service boundary is unverified; this is not a historic line-item reconstruction.

Which staff and employers are included: external operator cost equivalent

  • 99 operator FTE-equivalent service establishment is a policy estimate, not WRU employee disclosure or a redundancy recommendation.
  • 170-room capacity is evidenced; occupancy, prices, consumption and staffing are assumptions. Base room capacity: 62,050 available nights; 43,435 occupied nights.
  • Full-cost consolidated hotel service, not 75% of cost. Minority distributions, contract control, financing, renewal and actual unrestricted cash are separately modelled.
  • £13m FY2025 gross revenue and £9.2m cost do not prove net cash contribution: note narrative separately reports £2.8m EBITDA, showing that the category difference alone is not a hotel segment EBITDA measure.
Unit rates in GBP; payroll rates are basic salary, employer costs loaded once by the engine
Service / roleNumber / full-time-equivalent jobsLowBaseHighBasis and evidence
Hotel general manager
T-GM
1 (1 FTE)85,000105,000130,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Operator-employed cost equivalent; not additional WRU director.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Hotel operational department heads
T-DEPT
5 (5 FTE)42,00052,00065,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Rooms, food/beverage, kitchen, spa and maintenance.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Front office/night audit/guest services
T-FRONT
15 (15 FTE)27,00031,00037,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

24/7 front desk, night service and leave cover; excludes central finance.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Housekeeping and public-area attendants
T-ROOM
27 (27 FTE)26,00029,00034,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Permanent room cleaning workforce at 70% occupancy; workload ratio must be operationally tested.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Kitchen, restaurant and bars
T-KITCHEN
35 (35 FTE)27,00032,00040,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Food preparation, restaurant/bar service and porter coverage.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Spa therapists and reception
T-SPA
8 (8 FTE)27,00032,00040,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Rooftop spa operating service.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Hotel maintenance technicians
T-ENGINEER
3 (3 FTE)34,00042,00050,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Hotel footprint only; no stadium engineer duplicate.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Reservations, local purchasing and event fulfilment
T-BOOKINGS
5 (5 FTE)29,00035,00043,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Hotel-specific delivery; no central WRU sales/CRM.

external operator cost equivalent

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Room amenities and outsourced linen
T-ROOM-CONS
434356811occupied room nights
Formula and source

quantity * unitGBP

170 rooms *365 days *70% assumed occupancy. Cleaning labour already in role rows.

policy_assumption

FY2027 required operating service unit design

Parkgate hotel capacity and operator

Restaurant/bar/banqueting food and drink inputs
T-FOOD
1400007912meal/drink basket units
Formula and source

quantity * unitGBP

Breakfast, external restaurant, event and bar units; quantity needs EPOS validation.

policy_assumption

FY2027 required operating service unit design

Spa consumables
T-SPA-CONS
12000469spa treatment/session units
Formula and source

quantity * unitGBP

Not additional therapist staffing.

policy_assumption

FY2027 required operating service unit design

Hotel electricity/heat/water
T-ENERGY
1235,00050,00070,000months
Formula and source

quantity * unitGBP

Dedicated meter/operator charge only; remove from stadium supply volumes.

policy_assumption

FY2027 required operating service unit design

Hotel rates and property insurance
T-RATES-INS
1450,000650,000900,000property-year
Formula and source

quantity * unitGBP

No loan/finance lease interest/principal or depreciation.

policy_assumption

FY2027 required operating service unit design

Third-party booking distribution commissions
T-OTA
15000203042intermediated room nights
Formula and source

quantity * unitGBP

Subset of 43,435 occupied nights, £30 assumed fee not a verified channel contract.

policy_assumption

FY2027 required operating service unit design

Hotel payment acquisition
T-PAYMENTS
105000000.0080.010.014GBP eligible card receipts
Formula and source

quantity * unitGBP

Hotel only, not direct/hospitality payment duplication.

policy_assumption

FY2027 required operating service unit design

Hotel specialist lift/fire/HVAC routine service
T-SERVICE
1212,00018,00026,000monthly service packages
Formula and source

quantity * unitGBP

Specialist inspections/material beyond employed general maintenance; capital renewal elsewhere.

policy_assumption

FY2027 required operating service unit design

Property booking/EPOS/spa operational systems
T-IT
128,00012,00018,000monthly license/service packages
Formula and source

quantity * unitGBP

Hotel systems not corporate CRM or generic 720-seat office licenses.

policy_assumption

FY2027 required operating service unit design

Celtic Collection-style operator service return
T-OPERATOR
1300,000450,000700,000annual operator management fee
Formula and source

quantity * unitGBP

Model fee added to cost-plus labour/input reimbursement; never claim it is the actual operator fee.

policy_assumption

FY2027 required operating service unit design

Parkgate hotel capacity and operator

Peak event and absence-cover temporary labour
T-PEAK
10000162025all-in supplier hours
Formula and source

quantity * unitGBP

Peak above permanent workforce; no additional NI loading.

policy_assumption

FY2027 required operating service unit design

Spa/restaurant linen and pest/waste service
T-LAUNDRY-SERVICE
128,00012,00018,000monthly service packages
Formula and source

quantity * unitGBP

Excludes room linen already costed per occupied night.

policy_assumption

FY2027 required operating service unit design

Selected fully loaded FY2027 target — same service design in both structures, GBP m
PayrollSuppliersLevyTotal target
£3.87m£4.64m£0.02m£8.53m
National teams and performance pathways · proposed cost of the service

Starting point from the 2025 accounts: £17.80m. The proposed service boundary is unverified; this is not a historic line-item reconstruction.

Which staff and employers are included: proposed WRU direct or delivery workforce

  • Base national women and age-grade service design; excludes separate optional £0.4m additional women's upgrade. If that upgrade purchases any services above, replace that row instead of adding twice.
  • All men's national duty payments are distinct from equal regional grant, competition pass-through and regional senior payroll. Revenue-driven match bonus clauses remain a disclosure gap.
  • No guaranteed wins and no clinical/safeguarding reduction; no free NHS treatment or assumed university subsidy.
  • Training occupancy must be checked against cash lease/debt schedule; this operating occupancy row is not permission to subtract contractual rent or interest elsewhere.
Unit rates in GBP; payroll rates are basic salary, employer costs loaded once by the engine
Service / roleNumber / full-time-equivalent jobsLowBaseHighBasis and evidence
Performance service delivery lead
P-DELIVERY
1 (1 FTE)95,000120,000150,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Non-board programme service owner; must be omitted/replaced if one of central 60 executive posts is explicitly assigned this workload.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior men's head coach
P-M-HEAD
1 (1 FTE)350,000450,000600,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Policy salary band, not current named coach pay. Contract notice/settlement separate.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior men's assistant coaches
P-M-ASSIST
3 (3 FTE)100,000130,000175,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National duty programme only; not regional coaching salaries.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior men's national-duty physiotherapists
P-M-PHYSIO
2 (2 FTE)55,00065,00080,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National camp and match coverage, additional to regional everyday clinical provision.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior men's national-duty strength/conditioning
P-M-SC
3 (3 FTE)50,00065,00080,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Camp workload and leave cover; no regional roster payroll.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior men's national-duty analysts
P-M-ANALYST
2 (2 FTE)42,00055,00070,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

International opponent/team analysis only.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior men's team operations
P-M-OPS
2 (2 FTE)40,00050,00060,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Tour and camp operational managers, not central event sales.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior men's kit/logistics
P-M-KIT
1 (1 FTE)30,00035,00043,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National kit delivery, not regional club kit.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior women contracted players
P-W-PLAYERS
37 (37 FTE)40,00050,00065,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Basic annual salary policy; 37-contract cohort anchor is 2024/25, not asserted FY2027 actual. No second full salary for Celtic Challenge duty.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

WRU review of women's contracts

Senior women's head coach
P-W-HEAD
1 (1 FTE)110,000150,000200,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National role policy, not disclosed incumbent pay.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior women's assistant coaches
P-W-COACH
3 (3 FTE)50,00065,00085,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Dedicated training delivery.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior women's physiotherapists
P-W-MED
2 (2 FTE)45,00055,00068,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Protect clinical care and return-to-play independence.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior women's strength/conditioning
P-W-SC
2 (2 FTE)43,00055,00068,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Dedicated year-round programme.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior women's analyst
P-W-ANALYST
1 (1 FTE)38,00047,00060,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National service only.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Senior women's operations/kit coordinator
P-W-OPS
2 (2 FTE)32,00040,00050,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Travel, registration, kit and welfare logistics; non-clinical.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Men's U20 head coach
P-U20-HEAD
1 (1 FTE)80,000105,000140,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National age-grade, not regional academy head.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Men's U20 assistant coaches
P-U20-COACH
2 (2 FTE)48,00060,00075,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National age-grade service.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Men's U20 physiotherapists
P-U20-PHYSIO
2 (2 FTE)40,00048,00060,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National age-grade camps and fixtures only.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Men's U20 conditioning lead
P-U20-SC
1 (1 FTE)40,00050,00062,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National camp programme.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Men's U20 analysis and operations
P-U20-OPS
2 (2 FTE)36,00043,00054,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

One analysis and one operations FTE.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Men's U18 coaching and conditioning
P-U18
4 (4 FTE)40,00050,00065,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National U18 year-round equivalent; not regional academy staff.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Women's pathway delivery lead
P-W-PATH-LEAD
1 (1 FTE)65,00080,000100,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Three centre and satellite network lead.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

WRU women's future pathway

Women's development centre coaches
P-W-PDC
6 (6 FTE)36,00045,00055,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Two per three centres serving nine satellites; protected field delivery, not duplicate national coaches.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

WRU women's future pathway

Women's pathway regional clinical coverage
P-W-PATH-CLINICAL
3 (3 FTE)40,00048,00060,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

One per centre, national programme not men's regional medical establishment.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Women's U20 and academy national coaching
P-W-U20
3 (3 FTE)40,00050,00065,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National development service, separate from senior women coaches.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

National talent/scouting and transition specialists
P-TALENT
4 (4 FTE)38,00048,00060,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Four catchments, not four additional regional academy leads.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Elite coach development
P-COACHDEV
2 (2 FTE)50,00065,00085,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Professional national/age-grade coach education; community coach courses elsewhere.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

National programme sports psychology
P-PSYCH
2 (2 FTE)45,00060,00080,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Independent national athlete support; clinical escalation kept separate.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

National programme nutrition
P-NUTRITION
2 (2 FTE)40,00050,00065,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

National camps and women's contracted cohort; region procurement food not included.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Professional/age-grade competitions delivery
P-COMPETITION
2 (2 FTE)36,00045,00055,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Registration and fixture delivery for age grade/women/SRC; excludes regional competition distributions and community league administrators.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Men's national match-duty payments including employer-NIC allowance
P-M-FEES
2765,7506,9009,200player match appearances
Formula and source

23 * 12 * assumed gross match fee * 1.15; engine must not load again

23 matchday players ×12 fixtures. Unit = assumed £5k/£6k/£8k gross fee ×1.15 conservative NI allowance. No NI threshold relief or national duty fee claimed as actual. OUTSIDE equal regional base.

policy_assumption

FY2027 required operating service unit design

WRU Nations Championship 2026 fixtures

Men's non-match squad standby/training payments
P-M-CAMPFEES
1441,1501,7252,875paid non-match squad-week units
Formula and source

12 * 12 * assumed gross standby fee * 1.15

12 non-playing/call-up equivalents ×12 weeks; £1k/£1.5k/£2.5k gross ×1.15. Excludes the same player's already paid match week.

policy_assumption

FY2027 required operating service unit design

Men's national camp accommodation/food
P-M-CAMP
4200120155210person nights
Formula and source

quantity * unitGBP

60 travellers ×70 nights; national training facility hire separately. No player salary included.

policy_assumption

FY2027 required operating service unit design

Men's flights and international transport
P-M-TOUR
3001,4002,1003,200return-trip traveller equivalents
Formula and source

quantity * unitGBP

60 travellers ×5 trip-equivalents; itinerary must replace not simply add airfare bookings.

policy_assumption

FY2027 required operating service unit design

Men's national land transport and freight
P-M-COACH
1212,00018,00028,000match/camp blocks
Formula and source

quantity * unitGBP

Coach, luggage and equipment haulage; not regional URC travel.

policy_assumption

FY2027 required operating service unit design

Women's camp/tour accommodation and meals
P-W-CAMP
3000100135180person nights
Formula and source

quantity * unitGBP

50 travellers ×60 nights.

policy_assumption

FY2027 required operating service unit design

Women's international travel
P-W-FLIGHT
2009001,4002,200return-trip traveller equivalents
Formula and source

quantity * unitGBP

50 travellers ×4 trips; fixtures and destination mix unverified.

policy_assumption

FY2027 required operating service unit design

Women's international duty expense and bonus reserve
P-W-DUTY
230300500800player match appearances
Formula and source

quantity * unitGBP

23×10 fixtures incremental duty payment/expenses; base full-time salary above; assumed all-in cash cost.

policy_assumption

FY2027 required operating service unit design

National men's/women's U18/U20 trips
P-AGE-TRAVEL
1240,00060,00090,000squad tour/event blocks
Formula and source

quantity * unitGBP

Team transport and full board for age-grade squads; does not repay their regional year-round salary.

policy_assumption

FY2027 required operating service unit design

Age-grade domestic camps
P-AGE-CAMP
246,0009,00014,000team camp blocks
Formula and source

quantity * unitGBP

Temporary venue/board, not permanent training campus rental.

policy_assumption

FY2027 required operating service unit design

Celtic Challenge additional fractional coaches
P-CELTIC-COACH
1.6 (1.6 FTE)42,00050,00065,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

2 teams ×4 coaches ×0.2 annual FTE; hours outside national women's coaching workload. Not four full-time duplicate coaches.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Celtic Challenge additional fractional clinical staff
P-CELTIC-CLINICAL
1.2 (1.2 FTE)48,00060,00075,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

2 teams ×2 clinicians ×0.3 annual FTE; protected match/training additional hours.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Celtic Challenge additional operations
P-CELTIC-OPS
0.8 (0.8 FTE)33,00040,00050,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

2 teams ×0.4 FTE; additional hours beyond national team manager.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Celtic Challenge travel blocks
P-CELTIC-TRAVEL
242,8004,0006,000team match/training travel blocks
Formula and source

quantity * unitGBP

2 teams ×12 movement blocks; no national tour fare duplication.

policy_assumption

FY2027 required operating service unit design

WRU women's future pathway

Celtic Challenge venue blocks
P-CELTIC-VENUE
241,5002,0003,500team hosted event/training blocks
Formula and source

quantity * unitGBP

Hired incremental venue hours; no owned stadium renewal.

policy_assumption

FY2027 required operating service unit design

WRU women's future pathway

Celtic Challenge non-central player allowances
P-CELTIC-ALLOW
402,0003,0004,500uncontracted player seasons
Formula and source

quantity * unitGBP

Additional 20 per team not already among 37 central contracts; cost-inclusive policy allowance, employment classification unverified.

policy_assumption

FY2027 required operating service unit design

WRU women's future pathway

Celtic Challenge playing kit and consumables
P-CELTIC-KIT
80180250400squad member equipment packs
Formula and source

quantity * unitGBP

Players/staff across both squads; no free in-kind assumption.

policy_assumption

FY2027 required operating service unit design

Celtic Challenge competition insurance
P-CELTIC-INSURANCE
212,00020,00030,000teams
Formula and source

quantity * unitGBP

Only incremental competition cover not national duty policy.

policy_assumption

FY2027 required operating service unit design

Women's pathway education and travel bursaries
P-W-BURSARY
305,0008,00012,000uncontracted pathway players
Formula and source

quantity * unitGBP

Support rather than another national senior wage; tax/employment status subject to review. Not men's regional 20-player academy payroll.

policy_assumption

FY2027 required operating service unit design

Women's PDC and satellite venue sessions
P-W-PDC-VENUE
480100150230facility sessions
Formula and source

quantity * unitGBP

12 locations ×40 sessions; only hired marginal hours, not duplicate full-campus rent.

policy_assumption

FY2027 required operating service unit design

WRU women's future pathway

National training campus operating occupancy
P-TRAINING-RENT
1245,00065,00090,000months
Formula and source

quantity * unitGBP

Pitch/gym/office occupancy and utilities used by national squads; exclude loan/finance-lease debt and major capex. Existing facilities contract disclosure needed.

policy_assumption

FY2027 required operating service unit design

National doctor consultant cover
P-MEDICAL-DOCTOR
2506008001,100clinical service days
Formula and source

quantity * unitGBP

Senior/age-grade medical oversight and match cover, separate from physiotherapy staff; preserve minimum clinical approval.

policy_assumption

FY2027 required operating service unit design

National-duty scans/treatment/rehabilitation
P-MEDICAL-EXTERNAL
2001,5002,2503,500care episodes
Formula and source

quantity * unitGBP

Only incremental injury care while on national programme, not region insured claim paid a second time.

policy_assumption

FY2027 required operating service unit design

National duty player risk and travel insurance
P-PLAYER-INS
1280,000420,000650,000annual national duty insurance portfolio
Formula and source

quantity * unitGBP

Actual contracts/claims exclusions required. Separate region ordinary employment insurance and stadium public liability.

policy_assumption

FY2027 required operating service unit design

National performance kit/data/testing
P-PERF-TOOLS
1201,8002,5003,800athlete-equivalent service units
Formula and source

quantity * unitGBP

Specialist testing, GPS/data licensing and sports kit; not regional analyst apps, central corporate software or sponsor kit in kind counted as cash.

policy_assumption

FY2027 required operating service unit design

Elite integrity/anti-doping training and audit
P-INTEGRITY
126,0009,00014,000delivery/testing blocks
Formula and source

quantity * unitGBP

Programme integrity services, not corporate safeguarding executives or community courses.

policy_assumption

FY2027 required operating service unit design

GB Sevens programme support contribution
P-SEVENS
420,00030,00045,000seconded player/staff equivalents
Formula and source

quantity * unitGBP

Gross service contribution with any recharge income separate; FY25 note12 3 players+1 staff context, not four new WRU payroll salaries.

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Selected fully loaded FY2027 target — same service design in both structures, GBP m
PayrollSuppliersLevyTotal target
£7.35m£8.40m£0.03m£15.78m
Member-club, school and participation delivery · proposed cost of the service

Starting point from the 2025 accounts: £6.30m. The proposed service boundary is unverified; this is not a historic line-item reconstruction.

Which staff and employers are included: proposed WRU direct or delivery workforce

  • 58 employed FTE plus 100 partner contribution units is a designed delivery network, not an asserted reduction from audited 88 employees. Reconcile hub employer status first: an officer cannot sit on WRU payroll and be funded again through the external hub row.
  • Excludes FY2025 direct community/affiliate grants £3.3m, SRC £0.9m and all separately proposed new community/SRC/women upgrades. Existing club operating grant commitments remain outside this £6.3m replacement.
  • No member-club consultation has been held. Programme should be tested with clubs on facilities, coaching, referees, volunteer workload, women's changing access, safeguarding and transport before allocation.
  • Avoid counting the same base pack/course under optional uplift lines: optional quantity is incremental to these base service volumes.
Unit rates in GBP; payroll rates are basic salary, employer costs loaded once by the engine
Service / roleNumber / full-time-equivalent jobsLowBaseHighBasis and evidence
Community delivery director
C-LEAD
1 (1 FTE)85,000105,000130,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Programme delivery owner, not additional central corporate executive; omit if central role explicitly already covers it.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Area development leads
C-AREA
4 (4 FTE)47,00058,00070,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Four catchment service teams; no regional professional club commercial administration.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Local-authority rugby development officers
C-LOCAL
22 (22 FTE)33,00040,00049,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

One local coverage FTE per 22 authority areas, coaching and club-school links; policy service ratio not current WRU staff map.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Women/girls and inclusive rugby field officers
C-INCLUSION
8 (8 FTE)33,00041,00050,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Two per catchment covering licensed hubs and inclusive formats; separate from national women PDC coaching.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Community coach education workforce
C-COACH
6 (6 FTE)35,00044,00055,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Courses/tutor coordination; region academy coaches and elite coach development excluded.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Referee development and appointments
C-REF
6 (6 FTE)34,00042,00052,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Recruitment, training, mentoring and delivery support; amateur match referee fees reimbursed by clubs excluded.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Field safeguarding and welfare case support
C-SAFE
4 (4 FTE)37,00046,00056,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Local delivery and investigation liaison; central safeguarding policy/legal assurance budget separate; do not duplicate same investigator invoice.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Community league and cup delivery staff
C-COMP
4 (4 FTE)30,00038,00047,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Fixtures, volunteer training and event administration; not central six club-admin support posts.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Club facility support and grant project officers
C-FACILITY
3 (3 FTE)35,00044,00054,000annual basic salary per FTE
Formula and source

quantity * (unitGBP + 0.15 * max(0, unitGBP - 5000) + 0.05 * unitGBP)

Application/safety/project support, not capital grants themselves.

proposed WRU direct or delivery workforce

policy_assumption

FY2027 required operating service unit design

WRU Annual Report 2025, employee scope · p94

Matched external school/college/foundation hub support
C-HUB-MATCH
10012,00017,00022,000annual partner establishment contributions
Formula and source

quantity * unitGBP

WRU contribution ONLY to partner-employed delivery. No assumption 100 WRU FTE; partner match funding not added to WRU income. Reconcile employment register against 58 direct delivery FTE above.

policy_assumption

FY2027 required operating service unit design

WRU Hub Programme

Girls hub delivery materials and access
C-GIRLS-HUB
441,8002,5003,500licensed hub service awards
Formula and source

quantity * unitGBP

Base operating materials/entry access, not extra optional women's programme uplift or PDC cost.

policy_assumption

FY2027 required operating service unit design

WRU girls hub rugby

Community coaching course places
C-COACH-COURSE
180090130180learner places
Formula and source

quantity * unitGBP

Venue, learning materials and external assessment only; employed tutor salary above, no duplicate hourly tutor charge.

policy_assumption

FY2027 required operating service unit design

Referee learner and mentoring places
C-REF-COURSE
500100150220learner places
Formula and source

quantity * unitGBP

Materials, assessor travel and certification; employed development staff above.

policy_assumption

FY2027 required operating service unit design

Safeguarding and first-aid course access
C-SAFE-TRAIN
2500254065learner places
Formula and source

quantity * unitGBP

Third-party qualification/materials/venue, not ordinary staff safeguarding training in central supplier budget.

policy_assumption

FY2027 required operating service unit design

Local school and club participation festivals
C-FESTIVAL
1009001,4002,200events
Formula and source

quantity * unitGBP

External transport, local venue and event first aid. No stadium steward cost already elsewhere.

policy_assumption

FY2027 required operating service unit design

Road to Principality community finals incremental delivery
C-ROAD
106,00010,00015,000event days
Formula and source

quantity * unitGBP

Travel assistance, participants/officials and awards only; venue overhead/security/medical separately owned by stadia.

policy_assumption

FY2027 required operating service unit design

Community inclusive equipment packs
C-KIT
250180260380packs
Formula and source

quantity * unitGBP

Balls, flags, adapted kit and replacements; not optional targeted uplift's 100 additional starter-kit grants.

policy_assumption

FY2027 required operating service unit design

Field staff travel
C-TRAVEL
6000000.350.450.55business miles
Formula and source

quantity * unitGBP

All community delivery employees' local travel; no central corporate travel or club team travel uplift.

policy_assumption

FY2027 required operating service unit design

Community independent welfare counselling
C-WELFARE
60070100140clinical sessions
Formula and source

quantity * unitGBP

Qualified external mental-health support; no claim NHS will supply free.

policy_assumption

FY2027 required operating service unit design

Participation monitoring and independent programme review
C-DATA
412,00018,00028,000quarterly data/review packages
Formula and source

quantity * unitGBP

Programme outcome evaluation only; MyWRU software/platform license already in central IT excluded.

policy_assumption

FY2027 required operating service unit design

Community rules, bilingual guides and volunteer packs
C-TRAIN-MATERIAL
300100150220club/organisation packs
Formula and source

quantity * unitGBP

Rugby operating materials and external printing, not corporate brand translation retainer or a salary saving.

policy_assumption

FY2027 required operating service unit design

Selected fully loaded FY2027 target — same service design in both structures, GBP m
PayrollSuppliersLevyTotal target
£2.99m£2.97m£0.01m£5.97m
Central role design · basic salary, excluding employer costs
RoleFull-time-equivalent jobsYearly salary (£), before employer costs
CEO1£250,000
Finance, operations and commercial executive leads3£145,000
Financial controller1£90,000
Finance business partners2£60,000
Finance processing/payroll3£40,000
Treasury1£75,000
Finance analyst1£50,000
Company secretary1£95,000
Governance administrators2£40,000
People lead1£85,000
People advisers2£45,000
Learning1£40,000
Safeguarding specialists2£55,000
Executive support1£40,000
Brand lead1£75,000
Partnerships3£55,000
Licensing1£65,000
Digital3£45,000
Ticket/CRM service3£40,000
Event sales2£55,000
Content1£40,000
Technology lead1£90,000
Data specialists2£65,000
Systems/integration2£55,000
Cyber1£70,000
IT support2£35,000
Shared administration lead1£75,000
Club service administrators6£38,000
Programme coordinators3£45,000
Procurement2£55,000
Project managers2£55,000
Risk/control1£65,000
Facilities contract support1£55,000
WRU · FY2029 · active regional service costs, GBP m
RegionSenior-player pay and employer costsCost of running the regionRegion’s own incomeCompetitionShared services
Cardiff£6.42m£11.77m£3.68m£2.00m£0.21m
Dragons£6.42m£11.67m£2.73m£2.00m£0.21m
Scarlets£6.42m£12.06m£3.33m£2.00m£0.21m
YSA · FY2029 · active regional service costs, GBP m
RegionSenior-player pay and employer costsCost of running the regionRegion’s own incomeCompetitionShared services
Cardiff£6.42m£11.77m£3.68m£2.00m£0.21m
Dragons£6.42m£11.67m£2.73m£2.00m£0.21m
Ospreys£6.42m£11.64m£3.26m£2.00m£0.21m
Scarlets£6.42m£12.06m£3.33m£2.00m£0.21m
Moving to three teams: costs, changes and risks
Contraction effects — our estimates, not WRU admissions · GBP m
MeasureFY2027FY2028FY2029FY2030FY2031
One-off costs, whoever pays£0.22m£1.29m£0.65m£0.00m£0.00m
Cost of services that would still be needed£0.00m£0.00m£6.32m£1.72m£1.76m
Retained player pool — included above£0.00m£0.00m£3.85m£0.00m£0.00m
Local income expected to continue£0.00m£0.00m£0.81m£0.83m£0.86m
Competition income expected to continue£0.00m£0.00m£1.50m£1.50m£1.50m
WRU’s assumed share of the remaining shortfall£0.00m£0.00m£4.00m£0.00m£0.00m
Shortfall with no identified payer£0.00m£0.00m£0.00m£0.00m£0.00m

The retained player pool is unabsorbed contractual resource beyond the surviving base squads, not a fourth team. Competition receipts and own income offset its cost. Internal grant reductions are not whole-system savings. Regional and wider economic impact remain separate.

Sources, assumptions and the version you are reading

The charts and tables use the same saved calculation. Matching spreadsheet and PDF downloads are not ready yet. Older downloads do not represent this version.

How the figures were calculated
AssumptionStarting figureLow / highFormula / limitation
Annual operating-price growth
inflation
0.025 fraction0.015 / 0.05prior price × (1+inflation)
Planning rate, not forecast certainty.
policy_assumption
FY2026 central turnover bridge
fy26_revenue_growth
0.07582938388625582 fraction0.025 / 0.12(official group turnover forecast117 − assumed full-year Cardiff own income3.5) / FY25central105.5 −1
Forecast and ownership scope unverified. Does not treat £117m as unrestricted cash.
derived_estimate
FY2026 comparable central cost bridge
fy26_cost_growth
0.035 fraction0.015 / 0.07FY25 Note8 excluding Cardiff70.3 ×1.035
Mechanical run-rate estimate, not the misdated £67.8m cost claim.
estimate
FY2026 regional support bridge
fy26_regional_transfer_growth
0.07 fraction0 / 0.1FY25 net regional support proxy28.3 ×1.07
28.3 is net support at zero intragroup-interest assumption; not verified all-four cash payments.
estimate
FY2026 community and SRC distributions
fy26_protected_allocations
4.65 GBP m4.2 / 5.2community3.6 +10 SRC grants×0.105
Announcement-based annual proxy; central community costs remain separately in Note8.
estimate
FY2026 interest paid
fy26_cash_interest
4.3 GBP m3.5 / 5.5FY25 actual cash-interest4.3 held for transition-year estimate
Not P&L finance charge7.3. Replace with refinancing ledger.
estimate
FY2026 capital renewal cash
fy26_capex
4.3 GBP m3 / 6FY25 £4.3m additions/narrative level retained as renewal policy; reported cash purchases were £4.1m
No speculative disposal or new grant offsets it.
estimate
FY2026 bank principal cash repayment
fy26_bank_principal
0 GBP m0 / 3Explicit zero scheduled amortisation assumption
Refinanced contract unknown; zero is not reported absence of repayment.
estimate
FY2026 finance lease principal
fy26_lease_principal
1.3 GBP m1 / 2FY25 lease stock decrease43.6 vs44.9
Stock movement proxy; replace with actual lease payments.
estimate
FY2026 debenture redemptions
fy26_debenture_redemption
2.1 GBP m1 / 4FY25 reported debenture balance decrease50.9−48.8
Gross redemption schedule unknown; no new debenture subscription assumed.
estimate
FY2026 working capital cash use
fy26_working_capital_outflow
1 GBP m0 / 4Explicit net receivable/deferred ticket balance sensitivity
Not an audited cash bridge; collection timing may reverse.
estimate
Cardiff cash deficit beyond central funding
fy26_cardiff_cash_deficit
1.5 GBP m0.5 / 3Illustrative full-year subsidiary deficit after its WRU receipts
Successor accounts and central elimination needed; not annualised old company loss.
estimate
Cash unavailable for central distribution
unavailable_group_cash
1 GBP m0 / 3Group closing cash less this restriction/custody sensitivity
Parent FY25cash0.5 vs group3.9; legal pooling and restrictions not verified.
estimate
Annual national commercial-platform growth
national_income_growth
0.025 fraction0 / 0.05Central noncompetition revenue ×(1+growth)
Not a national-team winning forecast; rugby-cycle and match-calendar exposure stressed.
policy_assumption
Annual regional own-source revenue growth
local_income_growth
0.025 fraction0 / 0.05Regional own-source baseline ×(1+growth)
Scarlets baseline is accrued revenue, not wholly verified unrestricted cash.
policy_assumption
Correlated national income shock
downside_income_loss
0.1 fraction0.05 / 0.2All noncompetition central income ×0.90
Sponsorship and attendance co-move; local revenues independently use low source ranges.
policy_assumption
Downside additional cost inflation
downside_cost_inflation_extra
0.015 fraction0 / 0.03Base inflation +1.5 percentage points
Player and supplier inflation correlates across both structures.
policy_assumption
Upside national income level
upside_income_growth
0.05 fraction0 / 0.1All noncompetition central income ×1.05
Conditional higher trading, not booked income or evidence of secured sponsors.
policy_assumption
Downside commercial and savings delivery
downside_reform_delivery
0.5 fraction0 / 1Planned reform net contribution ×0.5
All reform costs and protected services remain payable.
policy_assumption
Reported parent wages
parent_wages_2025
12.6 GBP m12.6 / 12.6Note12
Not all administration; excludes defined termination/capitalisation.
audited_reported
Reported parent management average people
parent_management_people_2025
83 people83 / 83Note12
Not FTE or current establishment.
audited_reported
Estimated management share of parent wages
management_payroll_share
0.36671575846833576 fraction0.2785234899328859 / 0.403192227619708583×relative-wage-weight1.5 / (83×1.5 +215)
Estimated allocation only; other category shares follow same formula. Does not prove pay awards or waste.
estimate
Payroll difference realised in removed costs
management_cashable_fraction
0.8 fraction0 / 1Positive comparable payroll difference ×0.8
No named funded posts identified yet. Cashable share is an unapproved opportunity.
opportunity_hypothesis
Redeployed central roles retained in rugby
redeployed_fte
7 FTE0 / 123finance+1.5HR+1.5IT+1procurement in regional shared-service pool
Not a saving. Must map to available existing staff; no inference of redundancies.
policy_assumption
Redeployed average fully loaded role cost
redeployed_loaded_salary
68142.85714285714 GBP per FTE45000 / 75000(3×66000+1.5×66000+1.5×72000+1×72000)/7
Explicit regional shared-service staffing design; within £0.8m pool, not additional local salary.
policy_assumption
WRU-paid regional shared-service pool
shared_services_cost
0.8 GBP m0.6 / 1.2Seven-role/supplier pool from regional unit design, adjusted for staff redeployment overlap
£0.2m attributed to each geographic region; retained fourth pathway allocation if only3senior licences.
policy_assumption
Central exit cost sensitivity
redundancy_exits
10 people0 / 20Ten illustrative contract exits
Not83people−60FTE. Roster, notice and consultation needed.
policy_assumption
Central exit salary assumption
redundancy_average_salary
60000 GBP45000 / 80000Budgeted role salary
No named employee or actual entitlement.
policy_assumption
Central exit settlement envelope
redundancy_salary_months
6 months3 / 12Exits×salary×months/12
Combined notice/enhancement sensitivity; ensure no overlap with worked notice.
estimate
Shared systems and implementation cash
systems_transition_cost
0.45 GBP m0.2 / 0.8300 supplier days×£1000 +£0.15m migration/security contingency
Incremental cash to procure; no AI released-hours saving.
policy_assumption
Non-administration external procurement base
addressable_external_procurement
20 GBP m10 / 25Explicit subset of external supplier spend, excluding business/admin services, all wages and grants
Supplier register missing; no claim all Note8 spend is addressable. Existing Aramark gains cannot be counted again.
estimate
Additional cashable procurement reduction
procurement_saving_fraction
0.04 fraction0 / 0.06Addressable spend×4%
Tender opportunity net of unchanged service level, not verified contract savings.
opportunity_hypothesis
Reform delivery ramp
reform_ramp_years
2 years1 / 3min(1, year-index/ramp-years)
First-year half delivery; execution dates need validation.
policy_assumption
Extra paid national admissions per year
additional_paid_attendances
15000 admissions0 / 30000Six matches×2500 incremental paid admissions
Must establish unsold inventory and price elasticity; not assumed total attendance.
policy_assumption
Incremental ticket revenue net of VAT
ticket_net_yield
32 GBP per admission20 / 45Planning net realised yield
Published cheapest tickets are not an average yield; no hospitality seat double count.
policy_assumption
Incremental admission delivery cost
ticket_marginal_cost
6 GBP per admission4 / 12Security, ticketing, servicing marginal cash
Tender/ledger validation needed; baseline event-fixed costs remain.
policy_assumption
Non-overlapping new rights packages
additional_sponsor_slots
4 packages0 / 6Four incremental category/digital/venue inventories
Exclusivity and current contract inventory not disclosed.
opportunity_hypothesis
Incremental annual fee per package
sponsor_fee
0.2 GBP m0.1 / 0.4Four packages×£0.2m fee
Offer-price estimate, not evidence that WRU rejected such bids.
opportunity_hypothesis
Sponsor activation and servicing cost
sponsor_delivery_cost_fraction
0.2 fraction0.1 / 0.35New fees×20%
Subtract sales/delivery cash; do not add bundled in-kind values as cash.
policy_assumption
Additional stadium event days
additional_event_days
2 days0 / 3Incremental calendar slots beyond forecast core
Promoter, pitch, noise and turnaround constraints; announced FY26 events already in core.
policy_assumption
Net contribution per additional event
event_contribution_per_day
0.35 GBP m0.1 / 0.6Net hire/share after event servicing
Not gross tickets or local economic impact.
opportunity_hypothesis
Additional smaller corporate events
additional_corporate_events
20 events0 / 40Incremental nonmatch sales outside core and concert events
Avoid duplication with Aramark/hotel existing revenue.
policy_assumption
Net contribution per corporate event
corporate_event_contribution
0.012 GBP m0.005 / 0.02Net event cash after catering and venue costs
Planning unit margin, not quoted contract.
opportunity_hypothesis
Earliest licensed-sales upside included
kit_new_rights_first_year
2032 financial year2028 / 2032Outside base planning horizon pending contract inventory
No second royalty on existing Macron sales. Existing community kit is not new cash.
policy_assumption
Eligible additional licensed retail sales
incremental_licensed_sales
6 GBP m0 / 10Incremental nonteam-shirt retail volume×netprice
Not total WRU existing merchandise turnover; speculative until rights and sales volumes verified.
policy_assumption
Licensing royalty
kit_royalty_rate
0.08 fraction0.04 / 0.12Eligible incremental licensed sales×royalty
Negotiation assumption, not supplier contract.
policy_assumption
Lower-league kit support funded from new royalty
kit_club_discount_fund
0.2 GBP m0 / 0.4100clubs×£2000 incremental voucher ceiling
Only if new royalty activated; existing in-kind scheme not counted again.
policy_assumption
Earliest naming-rights upside included
naming_new_rights_first_year
2031 financial year2031 / 2032After announced2030term, full-year timing must be checked
Cannot rewrite a locked2027deal as cash available now.
policy_assumption
Incremental naming contribution in base
naming_incremental_net_contribution
0 GBP m0 / 2Zero until current fee, entitlements and renewal bids verified
Higher potential tested separately. Other stadium packages not directly comparable.
policy_assumption
Existing direct club allocation trajectory
community_direct_2027
3.8 GBP m3.6 / 4.4Announced£3.6mFY26 +£0.2m interpolated annualstep
Explicit interpolation toward2030£4.4m, not auditedFY27budget.
estimate
Core SRC allocations
src_core_2027
1.05 GBP m0.9 / 1.1Ten clubs×£105000 annuallicence funding
Announced unit basis differs from auditedFY25£0.9m expense; tenclubsneeds2027confirmation.
policy_assumption
Targeted extra women and girls pathway capacity
women_pathway_increment
0.4 GBP m0 / 0.8Eight additional delivery/clinical FTE-equivalent packages×£50000 loaded
Incremental service hypothesis; existing performance/community roles stay funded.
policy_assumption
Annual legacy regional debt service allowance
regional_legacy_debt_service
0.25 GBP m per region0 / 0.8Separate annual cash stress allowance per region
External non-WRU creditor cash only. Intragroup WRU receipts must be eliminated, not duplicated. Actual regional debt differs sharply; allowance is outside the equal base, not a verified schedule.
policy_assumption
Conservative levy on regional gross pay
apprenticeship_levy_rate
0.005 fraction0.005 / 0.005Gross wages+bonus×0.5%
No group/employer allowance assumed; allocate centrally onlyonce.
estimate
SONIA planning reference
sonia_planning_rate
0.04 fraction0.025 / 0.06Explicit planning rate; not today fixing
No interest hedge assumed.
estimate
Testimony-based bank margin
bank_margin
0.0275 fraction0.0275 / 0.0275SONIA+2.75 percentagepoints
Witness recollection; signed pricing/fees/covenants required.
official_unaudited
Downside extra borrowing rate
downside_interest_extra
0.02 fraction0.01 / 0.04Add two percentagepoints
Refinancing may also requirefees/security, notjustrate.
policy_assumption
Finance lease implied cash rate
lease_cash_interest_rate
0.035 fraction0.025 / 0.06Opening lease principal×3.5%
Estimated lease financing cost; operating lease costs remaininNote8.
estimate
Scheduled annual bank amortisation
annual_bank_principal
0 GBP m0 / 3Bullet facility assumption before maturity
Actual amortisation unknown; maturity balloon separately required.
estimate
Refinancing maturity sensitivity
bank_maturity_year
2030 financial year2029 / 2030January2026+approximately3.5years
Approximately July2029 falls inFY2030. Exact date unknown; earlierFY2029 stress separately available.
estimate
Fraction of maturity debt refinanced
bank_refinanced_fraction
0 fraction0 / 1Uncommitted refinancing=0 in base;1 inseparateconditionaltest
A facility limit is not a new draw. Replacement finance needs approvalandcashdraw/repayment.
policy_assumption
Annual finance lease repayment
annual_lease_principal
1.3 GBP m1 / 2FY25stockmovementproxy
Executed lease amortisation required.
estimate
Annual debenture repayments
annual_debenture_redemption
2.1 GBP m1 / 4FY25stockmovementproxy
No assumedrenewalproceeds; repaymentcalendarcouldbeuneven.
estimate
Central stadium/property renewal
annual_group_maintenance_capex
4.3 GBP m3 / 6HoldFY25£4.3m additions/narrative as policy and reprice; FY25cash purchases£4.1m
Containsno speculativefacilitysale. Regional£0.15meachseparate.
estimate
Annual central working capital use
annual_working_capital_outflow
0.5 GBP m0 / 2Separate cashconversionbuffer
Need monthly receivables, grantsrestrictions andadvance-ticketledger.
policy_assumption
Annual depreciation/amortisation proxy
annual_depreciation
6.6 GBP m5.5 / 8FY25D&A6.3+0.3
Shadow capital-preservation charge, not central statutory PBT: group figure includes£0.3m Cardiff goodwill amortisation. Asset-register allocation required.
estimate
Deferred grant amortisation
annual_deferred_income_release
1.5 GBP m1 / 1.5FY25noncashincomeheldconstant
AddedinP&Lonly, notspendablecash; grantbalancesmustlast.
estimate
Positive-profit tax cash sensitivity
tax_cash_rate
0.25 fraction0 / 0.25PositiveproformaPBT×25%
Conservativegroupapproximation; entitytaxlosses/relief/VATnotreconstructed. Notataxreturn.
policy_assumption
Central minimum available cash policy
minimum_central_cash_reserve
4 GBP m2 / 6£4mFY27floorindexedwithcostinflation
Policyfloor, notlendercovenant; separatetwo-monthreserve sensitivityrecommended.
policy_assumption
Debt-service coverage policy
shadow_minimum_dscr
1.2 ratio1 / 1.5Operatingcashbeforefinancing / cashinterestandscheduledprincipal
Illustrativeinternalguardrail; cannotcertifyactualcovenants.
policy_assumption